Residential

Residential Buildings

Ground-first engineering that secures long-term structural performance from the very first cut.

Our Project Gallery

Process Timeline

1. Survey validation and site preparation controls.

2. Bulk excavation and material movement planning.

3. Drainage network implementation and grading.

4. Base stabilization and road surfacing works.

5. Final compaction verification and handover readiness.

Features

  • Bulk earthworks and controlled cut-and-fill balancing.
  • Engineered drainage systems for runoff and flood management.
  • Road surfacing and access-route durability planning.
  • Ground preparation matched to structural loading demands.
  • Site integrity checks for long-term operational resilience.